Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin

Still deciding? Get samples of $ !
Request Sample
Product Details
Customization: Available
After-sales Service: Chat with Supplier Now for More Details.
Warranty: Chat with Supplier Now for More Details.
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (20)
  • Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
  • Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
  • Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
  • Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
  • Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
  • Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
Find Similar Products

Basic Info.

Model NO.
52L/195L
Application
Chat with Supplier Now for More Details.
Surface Treatment
Yes
Technics
Galvanized
Material
Steel
Type
Chat with Supplier Now for More Details.
Color
Yellow/Black
Length
Chat with Supplier Now for More Details.
Weight
Chat with Supplier Now for More Details.
Transport Package
Bag
Specification
30, 000PCS/BAG
Trademark
no
Origin
China

Product Description

Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
AL PIN
It is primarily used for the positioning, connection and securing of aluminum formwork in construction.
Its  details are as follows:
Application: Designed for use in construction aluminum formwork systems, facilitating rapid assembly and alignment of formwork panels to enhance construction productivity.
Features: Typically constructed from metal (often finished with galvanization or passivation coating for corrosion resistance), and incorporates a slotted design to allow for elastic adjustment during installation.
Classification: Available in two common variants—solid and hollow—with specifications selected based on parameters such as formwork thickness.
Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
Galvanized Aluminum Construction Formwork Wall Tie Wedge Stub Pin
FAQ
Q: Are you a trading company or a manufacturer?
A: We are a factory. Factories can ship directly without middlemen taking a cut. We offer the most favorable prices directly to customers.  
Q: How long is your delivery time?
A: If the goods are in stock, the delivery period is generally 5 to 10 days. If the goods are not in stock, the delivery period is 15 to 20 days, which depends on the quantity required.  
Q: Do you offer samples? Are they free or extra?
A: Yes, we can provide free samples within 500 grams, but the express delivery fee will be borne by the customer.  
Q: What are your payment terms?
A: If the contract amount is less than or equal to 3000 US dollars, 100% advance payment is required. If the contract amount is greater than or equal to 3000 US dollars, 30% T/T in advance is required. Before shipment, we will take photos of the finished products and send them to the customer. The customer can make the final payment and the goods can be dispatched.
 
Q: How to place an order?
A: 1. Specify the name and material of the product.
2. Indicate the quantity and size of the material.
3. Specify any special packaging or shipping instructions.
4. For custom steel grating, customers need to provide detailed drawings.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now
People who viewed this also viewed